Data centre MIC
100
MVA — grid connection
76.9
MW IT load (÷1.3 PUE)
BESS share of de-rated capacity
30%
BESS de-rated share
70%
Gas CCGT de-rated share
Gas + BESS capacity breakdown
Total de-rated required
-
MW (must ≥ MIC)
Gas CCGT nameplate
-
MW @ 0.85 de-rating
BESS nameplate
-
MW @ 0.15 de-rating
BESS storage
-
MWh (2-hr duration)
De-rated capacity split — Gas vs BESS
Gas CCGT:
BESS:
Annual energy & carbon — 66% utilisation, full capacity (yr 9+)
Annual consumption
-
GWh/yr total site
IT energy (÷1.3 PUE)
-
GWh/yr IT load
Gross carbon (grid avg)
-
kt CO2e/yr · 295 g/kWh
After 80% renewables
-
kt CO2e/yr (yr 9+)
Timeline — generation ramp & renewable glide path
Development — yrs 0-3
Planning, permitting & build
Glide path — yrs 3-9
Energisation yr 3; renewables ramp to 80%
Enduring — yrs 9-13+
80% renewable obligation met
Gas CCGT (de-rated MW)
BESS (de-rated MW)
MIC demand ramp (MVA)
80% renewable target
Renewable % (right axis)