LEU Calculator
Large Energy User connection · DCCOPP Version 3 · 20 May 2026 · ≥10 MVA · SEM 2030/31 T-4 de-rating factors
Nameplate capacity to scale
Data centre MIC
100 MVA
Dispatchable mix
0% BESS · 100% gas
BESS duration
Wind / solar split
Scopes what a data centre campus has to provide to connect under EirGrid’s DCCOPP Version 3: dispatchable generation and storage to match its MIC once de-rated, and new renewables for 80% of its annual demand. Nameplate figures are what would be built or contracted. De-rated figures are what counts towards the requirement. Gas and BESS are sized after the renewable credit.
Key inputs
Data centre MIC
100
MVA
IT load: 76.9 MW
(÷ 1.3 PUE)
10 MVA200 MVA
Annual demand701 GWh/yr
80% renewable target560.8 GWh/yr
20% residual grid draw140 GWh/yr
Dispatchable generation mix
0%
BESS
Gas CCGT: 100%
of de-rated capacity
0% (Gas only)100% (BESS only)
BESS duration
DR: 0.084
118 MW nameplate Gas — BESS
LEU Calculator · campus capacity to scale
Nameplate MW to build or contract for a Large Energy User connection · DCCOPP Version 3 · SEM T-4 de-rating factors
Data centre MIC
100 MVA
Dispatchable mix
0% BESS · 100% gas
BESS duration
Wind / solar split