Large Energy User connection · DCCOPP Version 3 · 20 May 2026 · ≥10 MVA · SEM 2030/31 T-4 de-rating factors ≡ EirGrid Appendix 1 inputs
Nameplate capacity to scale
Data centre MIC
100 MVA
Dispatchable mix
0% BESS · 100% gas
BESS duration
Wind / solar split
Scopes what a data centre campus has to provide to connect under EirGrid’s DCCOPP Version 3: dispatchable generation and storage to match its MIC once de-rated, and new renewables for 80% of its annual demand. Nameplate figures are what would be built or contracted. De-rated figures are what counts towards the requirement. Gas and BESS are sized after the renewable credit.
Key inputs
Data centre MIC
100
MVA
IT load: 76.9 MW (÷ 1.3 PUE)
10 MVA200 MVA
Annual demand701 GWh/yr
80% renewable target560.8 GWh/yr
20% residual grid draw140 GWh/yr
Dispatchable generation mix
0%
BESS
Gas CCGT: 100% of de-rated capacity
0% (Gas only)100% (BESS only)
BESS duration
DR: 0.084
118 MW nameplate Gas— BESS
Generation ramp & renewable glide path
Development — yrs 0–3
Planning, ECP-GSS, pre-app meeting
Glide path — yrs 3–9
Energisation yr 3; renewables ramp to 80%
Enduring — yrs 9+
Annual reporting to EirGrid
Gas (de-rated)
BESS (de-rated)
Renewable credit (de-rated)
MIC ramp
80% target
Renewable %
Renewable mix
Wind / solar split
100% wind / 0% solar
100% solar100% wind
Wind nameplate
—
MW (incl. dispatch down)
Solar nameplate
—
MW nameplate
Renewable credit
—
MW de-rated, taken off the dispatchable requirement
Renewables serve a dual purpose: they meet the 80% annual demand obligation and also contribute a de-rated credit against the dispatchable generation requirement. In practice this credit is small — wind de-rates at 0.059× and solar at 0.041× nameplate per the 2030/31 T-4 auction pack — so dispatchable generation remains the dominant requirement.
Assumptions
DC average annual MIC utilisation
80%
701 GWh/yr
Wind capacity factor
35%
Typical Irish onshore wind
Solar capacity factor
12%
Typical Irish utility solar
Wind dispatch down
30%
DCCOPP V3 App.1: 30%
Dispatchable generation to build · after renewable credit
Gas CCGT to build
—
MW nameplate @ 0.840 de-rating
BESS to build
—
MW nameplate @ 0.084 de-rating
BESS storage
—
MWh (2-hr duration)
De-rated requirement
—
MW de-rated, to be met by gas + BESS
Renewable & energy
Renewable required
—
GWh/yr (80% of demand)
Renewable nameplate
—
MW combined wind + solar
Annual consumption
—
GWh/yr | IT: — GWh/yr
Carbon — gross / post-80%
—
kt CO₂e/yr | 295 g/kWh 2025
Indicative capital cost estimate(order-of-magnitude only — not a quotation)
Gas CCGT
—
€900k/MW
BESS
—
€350k/MW + €300k/MWh
Wind
—
€1.6m/MW
Solar
—
€0.8m/MW
Total indicative capex
—
Gas and BESS as sized after the renewable credit, plus wind and solar (excludes DC build, grid connection, land)
De-rating factor tracker
LEU Calculator · campus capacity to scale